Loading...
BID TAB Street Improvement 2017Village of Buffalo Grove Fee: 2017 Street Improvements Payable to: 4798.018 Bid Opening: Leo Morand Bid Opening Location: Item No.Qty Unit Unit Price Total Unit Price Total Unit Price Total Unit Price Total Unit Price Total Unit Price Total 1.550.0 CY $30.00 $16,500.00 $15.00 $8,250.00 $27.00 $14,850.00 $40.00 $22,000.00 $44.40 $24,420.00 $70.00 $38,500.00 2.70.0 UN $1.00 $70.00 $35.00 $2,450.00 $0.10 $7.00 $10.50 $735.00 $75.00 $5,250.00 $35.00 $2,450.00 3.550.0 CY $35.00 $19,250.00 $15.00 $8,250.00 $35.00 $19,250.00 $35.00 $19,250.00 $38.90 $21,395.00 $21.00 $11,550.00 4.2,400.0 TN $26.00 $62,400.00 $9.00 $21,600.00 $20.00 $48,000.00 $10.50 $25,200.00 $23.60 $56,640.00 $24.00 $57,600.00 5.6,200.0 SY $12.00 $74,400.00 $13.55 $84,010.00 $14.75 $91,450.00 $9.00 $55,800.00 $12.50 $77,500.00 $10.50 $65,100.00 6.6,200.0 SY $2.00 $12,400.00 $0.90 $5,580.00 $0.90 $5,580.00 $2.00 $12,400.00 $1.00 $6,200.00 $1.00 $6,200.00 7.22,000.0 SY $1.00 $22,000.00 $1.35 $29,700.00 $0.60 $13,200.00 $1.00 $22,000.00 $1.25 $27,500.00 $0.55 $12,100.00 8.16,300.0 LB $1.00 $16,300.00 $0.01 $163.00 $0.01 $163.00 $0.10 $1,630.00 $0.73 $11,899.00 $0.01 $163.00 9.550.0 TN $70.00 $38,500.00 $59.60 $32,780.00 $65.00 $35,750.00 $70.00 $38,500.00 $65.75 $36,162.50 $76.00 $41,800.00 10.3,950.0 TN $65.00 $256,750.00 $58.00 $229,100.00 $56.00 $221,200.00 $63.00 $248,850.00 $54.70 $216,065.00 $66.00 $260,700.00 11.4,250.0 TN $68.00 $289,000.00 $62.55 $265,837.50 $59.00 $250,750.00 $65.00 $276,250.00 $61.35 $260,737.50 $70.00 $297,500.00 12.200.0 SY $55.00 $11,000.00 $60.00 $12,000.00 $60.00 $12,000.00 $63.00 $12,600.00 $54.00 $10,800.00 $60.00 $12,000.00 13.6,200.0 SF $6.00 $37,200.00 $5.85 $36,270.00 $5.50 $34,100.00 $6.14 $38,068.00 $5.55 $34,410.00 $6.50 $40,300.00 14.452.0 SF $5.00 $2,260.00 $15.00 $6,780.00 $20.00 $9,040.00 $15.75 $7,119.00 $13.00 $5,876.00 $35.00 $15,820.00 15.137.0 SF $40.00 $5,480.00 $28.00 $3,836.00 $35.00 $4,795.00 $29.40 $4,027.80 $27.00 $3,699.00 $30.00 $4,110.00 16.27,500.0 SY $8.00 $220,000.00 $5.75 $158,125.00 $5.25 $144,375.00 $6.00 $165,000.00 $7.85 $215,875.00 $7.50 $206,250.00 17.9,500.0 SY $2.50 $23,750.00 $3.40 $32,300.00 $2.50 $23,750.00 $2.00 $19,000.00 $1.45 $13,775.00 $3.50 $33,250.00 18.350.0 SY $15.00 $5,250.00 $13.30 $4,655.00 $12.00 $4,200.00 $12.60 $4,410.00 $16.00 $5,600.00 $12.00 $4,200.00 19.6,200.0 SF $2.00 $12,400.00 $1.20 $7,440.00 $2.00 $12,400.00 $1.26 $7,812.00 $2.73 $16,926.00 $2.00 $12,400.00 20.360.0 SY $48.00 $17,280.00 $25.00 $9,000.00 $38.00 $13,680.00 $50.00 $18,000.00 $27.00 $9,720.00 $15.00 $5,400.00 21.100.0 SY $47.00 $4,700.00 $25.00 $2,500.00 $38.00 $3,800.00 $50.00 $5,000.00 $27.00 $2,700.00 $15.00 $1,500.00 22.280.0 SY $46.00 $12,880.00 $25.00 $7,000.00 $35.00 $9,800.00 $50.00 $14,000.00 $27.00 $7,560.00 $15.00 $4,200.00 23.460.0 SY $45.00 $20,700.00 $25.00 $11,500.00 $31.00 $14,260.00 $45.00 $20,700.00 $27.00 $12,420.00 $15.00 $6,900.00 24.1.0 LS $100,000.00 $100,000.00 $24,696.00 $24,696.00 $60,000.00 $60,000.00 $20,000.00 $20,000.00 $38,000.00 $38,000.00 $68,000.00 $68,000.00 25.1,500.0 FT $20.00 $30,000.00 $19.20 $28,800.00 $21.25 $31,875.00 $44.10 $66,150.00 $42.00 $63,000.00 $42.00 $63,000.00 26.62.0 EA $350.00 $21,700.00 $405.00 $25,110.00 $600.00 $37,200.00 $367.50 $22,785.00 $350.00 $21,700.00 $350.00 $21,700.00 27.2.0 EA $1,200.00 $2,400.00 $1,595.00 $3,190.00 $1,600.00 $3,200.00 $1,050.00 $2,100.00 $1,000.00 $2,000.00 $1,000.00 $2,000.00 28.4.0 EA $500.00 $2,000.00 $535.00 $2,140.00 $1,200.00 $4,800.00 $472.50 $1,890.00 $450.00 $1,800.00 $450.00 $1,800.00 29.1.0 LS $50,000.00 $50,000.00 $5,700.00 $5,700.00 $14,000.00 $14,000.00 $33,600.00 $33,600.00 $16,250.00 $16,250.00 $55,400.00 $55,400.00 30.150.0 SY $40.00 $6,000.00 $32.65 $4,897.50 $24.00 $3,600.00 $30.00 $4,500.00 $50.00 $7,500.00 $22.00 $3,300.00 31.100.0 SF $10.00 $1,000.00 $12.50 $1,250.00 $35.00 $3,500.00 $13.13 $1,313.00 $12.50 $1,250.00 $15.00 $1,500.00 32.6,000.0 FT $24.00 $144,000.00 $27.00 $162,000.00 $30.00 $180,000.00 $28.35 $170,100.00 $25.10 $150,600.00 $30.00 $180,000.00 33.1,500.0 SY $9.00 $13,500.00 $5.50 $8,250.00 $10.50 $15,750.00 $8.40 $12,600.00 $5.00 $7,500.00 $5.50 $8,250.00 34.1,500.0 SY $0.30 $450.00 $1.00 $1,500.00 $2.50 $3,750.00 $2.10 $3,150.00 $0.30 $450.00 $1.00 $1,500.00 35.1,500.0 SY $2.00 $3,000.00 $0.36 $540.00 $3.00 $4,500.00 $2.10 $3,150.00 $4.00 $6,000.00 $0.36 $540.00 36.3.0 EA $275.00 $825.00 $100.00 $300.00 $1,500.00 $4,500.00 $1,500.00 $4,500.00 $1,500.00 $4,500.00 $100.00 $300.00 37.2.0 EA $600.00 $1,200.00 $675.00 $1,350.00 $900.00 $1,800.00 $682.50 $1,365.00 $650.00 $1,300.00 $650.00 $1,300.00 38.20.0 FT $30.00 $600.00 $28.00 $560.00 $56.00 $1,120.00 $29.40 $588.00 $50.00 $1,000.00 $20.00 $400.00 39.1.0 EA $300.00 $300.00 $1,800.00 $1,800.00 $500.00 $500.00 $2,050.00 $2,050.00 $2,000.00 $2,000.00 $1,800.00 $1,800.00 40.130.0 FT $15.00 $1,950.00 $7.25 $942.50 $7.25 $942.50 $15.75 $2,047.50 $7.25 $942.50 $7.25 $942.50 41.24.0 FT $30.00 $720.00 $37.50 $900.00 $37.50 $900.00 $31.50 $756.00 $37.50 $900.00 $37.50 $900.00 42.20,000 DLR $1.00 $20,000.00 $1.00 $20,000.00 $1.00 $20,000.00 $1.00 $20,000.00 $1.00 $20,000.00 $1.00 $20,000.00 $1,580,115.00 $1,273,052.50 $1,378,337.50 $1,410,996.30 $1,429,822.50 $1,572,625.50 Class D Patches, Type IV, 6" Removal and Disposal of Unsuitable Material Supplemental Watering Aggregate Subgrade Improvement Aggregate Base Course, Type B, Varies Aggregate Base Course, Type B, 9" Geotechnical Fabric for Ground Stabilization Preparation of Base Bituminous Materials (Tack Coat) Leveling Binder (Machine Method) Hot-Mix Asphalt Binder Course Hot-Mix Asphalt Surface Course Tree Removal Thermoplastic Pavement Markings, 12" Thermoplastic Pavement Markings, 24" Owner's Contingency Mobilization Pipe Underdrains, 4" Drainage & Utility Structures To Be Adjusted Drainage & Utility Structures To Be Reconstructed F&P "CRETEX" External Chimney Seal Traffic Control and Protection Hot-Mix Asphalt Driveway Pavement, 3" Temporary Information Signing Comb Concrete Curb & Gutter R&R General Landscape Restoration Temporary Erosion Control Seeding (Temporary) Mulch Method 3 J.A. Johnson Paving Arlington Heights, IL BID TABULATION Mowing Catch Basin to be Adjusted with New T1, F&G Barrier Curb Portland Cement Concrete Driveway Pavement, 6" Portland Cement Concrete Sidewalk 5" Detectable Warnings (Furnished by Others) Detectable Warnings Pavement Removal Hot-Mix Asphalt Surface Removal, 2 3/4" Driveway Pavement Removal Sidewalk Removal Class D Patches, Type I, 6" Class D Patches, Type II, 6" Class D Patches, Type III, 6" $50.00 Description Client: Project: GHA Project No: Project Manager: Engineer's Estimate of Probable Cost Peter Baker & Son Lake Bluff, IL Gewalt Hamilton Associates, Inc. 3/30/17 10:00 A.M. Village Hall Lorig Construction Des Plaines, IL Brothers Asphalt Addison, IL Arrow Road Construction Mt. Prospect, IL