Loading...
BIDTAB Sidewalk 2017Village of Buffalo GroveFinance Department Sidewalk Project 2017 Tabulation D'Land Construction LLC Globe Construction Mondi Construction, Inc.Path Construction Company Schroeder & Schroeder.Suburban Concrete, Inc. Bid Opening: March 28, 2017 600 S. Countyline Rd #1N 1781 W. Armitage Court 1827 Blackhawk Dr.125 E. Algonquin Rd.7306 Central Park 21227 W. Commercial Dr. Ste B Bensenville, IL 60106 Addison, IL. 60101 West Chicago, IL. 60185 Arlington Hts, IL 60005 Skokie, IL. 60076 Mundelein, IL. 60060 Bid Bond:Yes Yes Yes Yes Yes Signed Proposal Form:Yes Yes Yes Yes Yes Signed Public Contract Statements:Yes Yes Yes Yes Yes Contract Modifications Requested No No No No No Traffic Control & Protection $6,750.00 $2,950.00 $15,000.00 $25,000.00 $4,750.00 lump sum Removal and Replacement of Sidewalk $143,910.00 $145,080.00 $138,060.00 $193,050.00 $175,500.00 23400 SQ FT $6.15 $6.20 $5.90 $8.25 $7.50 Detectable Warnings $1,750.00 $1,260.00 $1,540.00 $1,680.00 $3,150.00 70 SQ FT $25.00 $18.00 $22.00 $24.00 $45.00 Tree Root Pruning $7,875.00 $5,625.00 $3,600.00 $10,260.00 $4,500.00 45 each $175.00 $125.00 $80.00 $228.00 $100.00 Sidewalk Base Preparation $5,625.00 $4,050.00 $3,600.00 $5,625.00 $4,500.00 45 each $125.00 $90.00 $80.00 $125.00 $100.00Removal & replacement 6" Driveway $11,375.00 $9,625.00 $10,237.50 $16,800.00 $12,600.00 175 SQ YD $65.00 $55.00 $58.50 $96.00 $72.00 Class B Patches 10 inch $4,930.00 $4,640.00 $4,176.00 $13,224.00 $4,930.00 58 SQ YD $85.00 $80.00 $72.00 $228.00 $85.00 Class B Patches 8 inch $17,200.00 $15,050.00 $15,050.00 $58,050.00 $16,125.00 215 SQ YD $80.00 $70.00 $70.00 $270.00 $75.00 6" PCC Slab Monolithic Barrier Curb $6,400.00 $6,000.00 $6,060.00 $7,120.00 $6,000.00 80 SQ YD $80.00 $75.00 $75.75 $89.00 $75.00 Removal & Replacement Curb & Gutter B-6.12 $7,420.00 $6,625.00 $6,360.00 $10,600.00 $9,805.00 265 feet $28.00 $25.00 $24.00 $40.00 $37.00 Removal & Replacement Curb & Gutter B-6.24 $2,695.00 $2,310.00 $2,156.00 $3,426.50 $3,619.00 77 feet $35.00 $30.00 $28.00 $44.50 $47.00Drainage & Utility Structures Adjusted $1,050.00 $750.00 $750.00 $3,600.00 $1,275.00 3 each $350.00 $250.00 $250.00 $1,200.00 $425.00 Hot-Mix Asphalt Driveway Surface R&R $3,000.00 $3,500.00 $3,000.00 $15,000.00 $2,700.00 50 SQ YD $60.00 $70.00 $60.00 $300.00 $54.00 Topsoil and seed with Blanket $4,860.00 $3,645.00 $3,240.00 $5,265.00 $4,860.00 405 SQ YD $12.00 $9.00 $8.00 $13.00 $12.00 TOTAL COST $224,840.00 $211,110.00 $212,829.50 $368,700.50 $254,314.00 No Bid - Too Busy $0.00