Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
BIDTAB Street Improvement Phase III 2016
Village of Buffalo Grove - Phase 3 Fee: 2016 Street Improvements Payable to: 4798.010 Bid Opening: Leo Morand Bid Opening Location: Item No.Qty Unit Unit Price Total Unit Price Total Unit Price Total Unit Price Total Unit Price Total 20201200 Removal and Disposal of Unsuitable Material 573.0 CY $45.00 $25,785.00 $32.50 $18,622.50 $34.00 $19,482.00 $50.00 $28,650.00 $35.00 $20,055.00 25200200 Supplemental Watering 577.0 UN $10.00 $5,770.00 $0.10 $57.70 $10.00 $5,770.00 $50.00 $28,850.00 $1.00 $577.00 30300001 Aggregate Subgrade Improvement 573.0 CY $35.00 $20,055.00 $32.45 $18,593.85 $46.00 $26,358.00 $60.00 $34,380.00 $35.00 $20,055.00 35101400 Aggregate Base Course, Type B 18,344.0 TN $22.00 $403,568.00 $27.85 $510,880.40 $5.00 $91,720.00 $3.00 $55,032.00 $23.00 $421,912.00 35800100 Preparation of Base 88,989.0 SY $0.75 $66,741.75 $0.25 $22,247.25 $1.00 $88,989.00 $1.00 $88,989.00 $1.00 $88,989.00 40600290 Bituminous Materials (Tack Coat)73,725.0 LB $1.00 $73,725.00 $0.75 $55,293.75 $0.01 $737.25 $0.01 $737.25 $0.01 $737.25 -Leveling Binder (Machine Method)5,528.0 TN $65.00 $359,320.00 $60.60 $334,996.80 $66.50 $367,612.00 $73.00 $403,544.00 $70.65 $390,553.20 -Hot-Mix Asphalt Binder Course 13,143.0 TN $60.00 $788,580.00 $55.60 $730,750.80 $61.00 $801,723.00 $68.50 $900,295.50 $66.35 $872,038.05 -Hot-Mix Asphalt Surface Course 19,354.0 TN $65.00 $1,258,010.00 $58.50 $1,132,209.00 $65.00 $1,258,010.00 $71.65 $1,386,714.10 $68.50 $1,325,749.00 42300200 Portland Cement Concrete Driveway Pavement, 6"525.0 SY $75.00 $39,375.00 $48.00 $25,200.00 $50.00 $26,250.00 $60.00 $31,500.00 $50.00 $26,250.00 42400200 Portland Cement Concrete Sidewalk 5"31,500.0 SF $6.00 $189,000.00 $4.50 $141,750.00 $5.50 $173,250.00 $4.50 $141,750.00 $6.50 $204,750.00 -Detectable Warnings 3,885.0 SF $45.00 $174,825.00 $22.00 $85,470.00 $37.00 $143,745.00 $22.00 $85,470.00 $40.00 $155,400.00 -Pavement Removal 88,989.0 SY $8.00 $711,912.00 $3.95 $351,506.55 $5.20 $462,742.80 $6.50 $578,428.50 $9.50 $845,395.50 44000166 Hot-Mix Asphalt Surface Removal, 2 3/4"74,779.0 SY $3.00 $224,337.00 $1.55 $115,907.45 $3.90 $291,638.10 $4.00 $299,116.00 $2.80 $209,381.20 44000200 Driveway Pavement Removal 630.0 SY $15.00 $9,450.00 $12.00 $7,560.00 $14.00 $8,820.00 $1.00 $630.00 $12.00 $7,560.00 44000600 Sidewalk Removal 31,500.0 SF $1.50 $47,250.00 $1.50 $47,250.00 $1.00 $31,500.00 $1.50 $47,250.00 $1.10 $34,650.00 44201713 Class D Patches, Type I, 6"797.0 SY $40.00 $31,880.00 $21.00 $16,737.00 $40.00 $31,880.00 $15.00 $11,955.00 $55.00 $43,835.00 44201717 Class D Patches, Type II, 6"797.0 SY $38.00 $30,286.00 $21.00 $16,737.00 $40.00 $31,880.00 $15.00 $11,955.00 $50.00 $39,850.00 44201721 Class D Patches, Type III, 6"2,365.0 SY $36.00 $85,140.00 $21.00 $49,665.00 $35.00 $82,775.00 $15.00 $35,475.00 $45.00 $106,425.00 44201723 Class D Patches, Type IV, 6"3,929.0 SY $34.00 $133,586.00 $21.00 $82,509.00 $35.00 $137,515.00 $15.00 $58,935.00 $43.00 $168,947.00 67100100 Mobilization 1.0 LS $300,000.00 $300,000.00 $164,000.00 $164,000.00 $398,025.00 $398,025.00 $330,000.00 $330,000.00 $375,000.00 $375,000.00 78000100 Thermoplastic Pavement Marking - Letters & Symbols 285.0 SF $5.00 $1,425.00 $4.00 $1,140.00 $4.00 $1,140.00 $4.00 $1,140.00 $4.40 $1,254.00 78000200 Thermoplastic Pavement Marking - Line 4"2,110.0 FT $1.00 $2,110.00 $0.80 $1,688.00 $1.00 $2,110.00 $0.80 $1,688.00 $1.10 $2,321.00 78000300 Thermoplastic Pavement Marking - Line 5"786.0 FT $1.40 $1,100.40 $1.00 $786.00 $1.10 $864.60 $1.00 $786.00 $1.20 $943.20 78000400 Thermoplastic Pavement Marking - Line 6"1,155.0 FT $1.50 $1,732.50 $1.20 $1,386.00 $1.30 $1,501.50 $1.20 $1,386.00 $1.45 $1,674.75 78000600 Thermoplastic Pavement Marking - Line 12"488.0 FT $3.00 $1,464.00 $2.40 $1,171.20 $2.00 $976.00 $2.40 $1,171.20 $2.20 $1,073.60 78000650 Thermoplastic Pavement Marking - Line 24"71.0 FT $5.00 $355.00 $6.00 $426.00 $4.00 $284.00 $6.00 $426.00 $4.05 $287.55 Z0017400 Drainage & Utility Structures To Be Adjusted 275.0 EA $450.00 $123,750.00 $320.00 $88,000.00 $310.97 $85,516.75 $320.00 $88,000.00 $350.00 $96,250.00 Z0017700 Drainage & Utility Structures To Be Reconstructed 11.0 EA $800.00 $8,800.00 $1,000.00 $11,000.00 $1,539.50 $16,934.50 $1,000.00 $11,000.00 $1,250.00 $13,750.00 -F&P "CRETEX" External Chimney Seal 28.0 EA $6.00 $168.00 $400.00 $11,200.00 $313.72 $8,784.16 $400.00 $11,200.00 $650.00 $18,200.00 X7010216 Traffic Control and Protection 1.0 LS $150,000.00 $150,000.00 $41,444.00 $41,444.00 $107,606.84 $107,606.84 $330,046.55 $330,046.55 $245,000.00 $245,000.00 Z0004510 Hot-Mix Asphalt Driveway Pavement, 3"550.0 SY $40.00 $22,000.00 $56.50 $31,075.00 $37.55 $20,652.50 $42.00 $23,100.00 $40.00 $22,000.00 Z0030850 Temporary Information Signing 1,100.0 SF $25.00 $27,500.00 $3.00 $3,300.00 $3.00 $3,300.00 $3.00 $3,300.00 $25.00 $27,500.00 -Comb Concrete Curb & Gutter R&R w/PCC Fill 12,714.0 FT $30.00 $381,420.00 $23.00 $292,422.00 $24.00 $305,136.00 $23.00 $292,422.00 $23.50 $298,779.00 -Comb Concrete Curb & Gutter R&R w-out/PCC Fill 15,554.0 FT $24.00 $373,296.00 $21.00 $326,634.00 $19.00 $295,526.00 $21.00 $326,634.00 $23.00 $357,742.00 -General Landscape Restoration 12,590.0 SY $10.00 $125,900.00 $9.50 $119,605.00 $5.50 $69,245.00 $5.91 $74,406.90 $1.00 $12,590.00 Total Base Bid $6,199,616.65 $4,859,221.25 $5,400,000.00 $5,726,363.00 $6,457,474.30 $25.00 Description Client: Project: GHA Project No: Project Manager: Engineer's Estimate of Probable Cost BID TABULATION Arrow Road Construction Mount Prospect, IL Gewalt Hamilton Associates, Inc. May 19, 2016 - 10:00 A.M. Village Hall Peter Baker & Son Lake Bluff, IL Johnson Paving Arlington Heights, IL Alamp Concrete Schaumburg, IL