2016-03-21 - Ordinance 2016-017 - ADDING CHAPTER 2.74, AMENDING CHAPTER 13.12, AMENDING CHAPTER 15.24, AMENDING SECTION 18.20.020 OF THE MUNICIPAL CODE 03/11/2016
ORDINANCE NO. 2016- 017
AN ORDINANCE ADDING CHAPTER 2.74. DIGITAL DATA STANDARDS.
AMENDING CHAPTER 13.12, STORMWATER DISCHARGE AND DETENTION,
AMENDING CHAPTER 15.24, SOIL EROSION AND SEDIMENTATION CONTROL.
AND AMEND SECTION 18.20.020, NEW DEVELOPMENT STANDARDS
OF THE-VILLAGE OF BUFFALO GROVE MUNICIPAL CODE
WHEREAS, the Village of Buffalo Grove is a Home Rule Unit pursuant to the Illinois
Constitution of 1970; and
WHEREAS, it is beneficial to the Village to maintain GIS documents in an appropriate
digital data format; and
WHEREAS, it is prudent that the Village adopt the latest editions of the Metropolitan
Water Reclamation District of Greater Chicago's Watershed Management Ordinance and the
Lake County Stormwater Management Commission's Watershed Development Ordinance; and
WHEREAS, the Village desires to amend its to water Management Plan; and
WHEREAS, the Village desires to update its development standards.
NOW THEREFORE BE IT ORDAINIED BY THE PRESIDENT AND BOARD OF
TRUSTEES OF THE VILLAGE OF BUFFALO GROVE, COOK AND LAKE
COUNTIES, ILLINOIS, as follows:
Section 1. The foregoing recitals are hereby adopted and incorporated into and made
a part of this Ordinance as if fully set forth herein.
Section 2. Chapter 2.74, Digital Data Standards, is hereby added to the Buffalo
Grove Municipal Code, to read as follows:
Chapter 2.74—DIGITAL DATA STANDARDS
Sections:
2.74.010—Purpose,
2.74.020—Digital data submissions required.
2.7 .030—Ties to datum required.
2.74.040—Acceptable geospatial data formats.
2.74.050— Processing fee required for nondigital submissions.
2.74.060—Preemption.
2.74.010—Purpose.
It is the goal of the Village to create, maintain, and/or refine existing GIS data, and the
submission of such documents in an appropriate digital data format to facilitate ready reference
and access to such documents to support sound decision making, to facilitate the production of
such documents pursuant tote Illinois Freedom of Information Act when not exempt from
production, and to improve the foundation of the geographic information systems in is the
Village participates.
2.7 .020—Digital data submissions required.
Any party submitting plans, drawings, plats, and/or surveys for the purpose of seeking
any Village permit, permission, or approval shall be required to submit digital versions of such
documents, and of all revisions and final forms thereof, if approved by the Village.
2.74.030—Ties to datum required.
Digital documents shall be tied to the Illinois state plane coordinate system as defined by
the North American at of 1983 (NAD83), and can sea level as defined by the North
American vertical datum of 1988 (NAVD88). At least two (2) control points shall be clearly
identified within each document.
2.74.040—Acceptable geospatial data formats.
All submissions of digital data as required by this Chapter shall be one of the following
geospatial data formats:
DGN Intergraph graphics file format
DWG Native AutoCAD file format
DXF Drawing exchange format, popular with
most CAD software
EOO ESRI export file format
SHAPE Popular E geographic file format
All other documents submitted for the purpose of seeking any Village permit, permission,
or approval, including, but not limited to, studies, inventories, databases, aerial or renderings
and/or photo imagery, and/or any other prepared documentation, shall be submitted using one of
2
the following file formats: img, Ai f, .sid, Abf, xls/.xlsx, mdb/.accdb, csv, .t t, doe/.docx, or
Axt. Documents shall not be submitted solely in hardcopy or "pdf' format.
2.7 .050-Processing fee required for nondigital submissions.
Any party who, for any reason, does not, cannot, or will not provide digital data
submittals in accordance with the standards required by this Chapter shall be charged a document
processing fee per document of two (2) times the hourly rate for the Village staff member or
consultant who digitizes said docurnent(s) from nondigital source documents. The document
processing fee required by this Section may be waived for a specific document or documents by
the Village Manager, or his or her designee, but only in the event he or she finds that there will
be no significant public benefit provided tote Village byte conversion of such document(s)
into an acceptable geospatial digital data format as otherwise required by this Section.
2.74.060-Preemption.
The standards and requirements of this Chapter shall prevail, govern and control,
notwithstanding any and all other provisions of this Code or any other Village ordinance to the
contrary unless the Village Manager determines to do so of cause an undue hardship.
Section 3. Sections 13.12.050, 13.12.060, 13.12.070, 13.12.080, 13.12.090, 13.12.100, and
13.12.110 of the Buffalo Grove Municipal Code are hereby repealed.
Chapter 13.12 - STORMWATER DISCHARGE AND DETENTION
Sections:
13.12.115 Adoption of the Metropolitan Water Reclamation District of Greater Chicago's
Watershed Management Ordinance and the-Lake County Storrnwater
Management Commission's Watershed Development Ordinance by reference.
13/12.120 Violation - Penalty
11. - Stormwater Detention
13.11050 - 1�eqLl i rf-MO C 11 k
pennk-wffl
par-tielpates in the h.
1-3-A 2.13 -Detention shall be
required in accordance with the requirements set forth ill Metropolitan the Mctr1'tan Water
c � 1
-
Reclamation District of Greater Chicago's..tM Chicago's WRD) Watershed Manaaement Ordinance
(WM ) latest editioti, for properties located in Cook County and the Lake County
3
Stormwater Managctnent o)irtmission's PLC-SMC Watershed Develo €7� ent Ordinance
(WDQI latcSt edition, for propLIties 1qczlcr1 in Lake COun
�3:-1�9F�4)-���r�t1}rr€aticrn•f�•f stc3rage an�1-cf�i-�ti{�l}ec�--tekea�e l�e�iii��ti��-hLr�
�: �1-c�€x�i�t�����-star-age..aa}c��:�}r�trs�l�Efire-lie-{���if��rwatet�r��e��r#€-is-re�•�iree}-lf�i�_al•�
E��VL'-1H�.�i-t7F`li�`.i;�ic}►,�fe�e�a i'��-kr3-1��-wfx�trrl��rtEC��ka�-�hc�--rE��€�efl--4a�al-�do��k3-� en#s-t�tat
(atll-belf}w-t}-x�--Fx-�-s�-tc-:-date€�tic�€� t3}resllc}leis-€���e�ed-i-ri-�f�e-k�a�e--���i:€€-€t}�W-atei-sl�eEf
Develop nt Q-di.,.,,,,.,_�l�d�eka�n�efi�t�a�l�€st h�rve�r�-a�fe�crate etrtfet a�: itler�HEii�d 13y tie
Vi 4a ngf peer-. iud--by-# -Vill-age
1ar-rgi eer, will 1}e refltr cef�tt� tt�€cwt a xr€'tit�t3 erl the r�€nc�FF� c efiirr -tire-caEttere t
The an owit-o-f-the tec�-in-€��z-eontrib�tie{��aflbe thift, ousan i-do lar-s firer
B---Redeve-lo ts-detentit}n tiireshokk-may.be
cc}ta i cie�e�i or e�-frt-1 i� �etentinn can l-+' -i-t-1 to red ro x eir i5-ti i Ysutaa�y-tt�-arm e i sti i�
Stormw•ater-- anage�-..en+ -VU;I"+y t day
-1-3 '?-47f3 -IWeaw-rte-fest3r-i-etions-.
�:•�'he-•rei�a�r�-te--a�-Stc��-rt�ate:>-l=rtx���xl l-��e}r�r��e�#s--reE�t-ir-frig-do�tek�--s�k-a-1-l--riot-e�eeed
the-StF3f H1riiLeF FU •,,v Rite-ffotrn. ~n he a[-ea i-n4ts-iiaturaal-L€-Aeveloped-state,
and B�-�3ee:at€se-t�-[=t-h�-�]-�t-eor�ti-it}orrs••e�f<tl�e--}ar�f�-���-i�� -lc�el--eE�-�t��-�tti�rrts-ems€-by-�€atare
a�'e-- car}eKrly-rrr�al�ke- �ar�c�fe ti3e Tes—t�n
�3c3f}p1ai€��l car-ale-o�-s{�reac�-i3t�r-rurx}Ff=eve�tile-1•ar�d-•e�-ea�••ffkx�i•ng-t1 k�a�e�-st�e�ir�ds.
ft� a€'cier r�c�t to inn e -the--rt-rn t ram t, a# er- }e ekcrt�€3 e€3t }e r leave rates i r�r t
�x� 1��r teci�er s ar€y}r��ca etty e#-thesenat� al--
The V1•1lage--wil-l--aeceF-the re ate-of'-m t d fi storj:n of
Ewt�r-yeas l�'ti�•t�enc;-��rtk�-a--rEn-x�#€-rate.`'--ef]t�E�itrGl�t C}F-{1:1•�-,-k�i�rless-ti•�e••a.�}�l•ieailt�a�-�l�a-w-�y
�rrsl-he�dc.•aril-�:ale.�lati�x�s-w#i-c-1�--a-re-�e-b-y-#-)�e�4EM�e;tf�t#�e�•se:irar•�e-•r��Fr€�-t#�e
r�`�i-ral��tl et-ci}a��i�el..ser-�i€��-tl�t•�area-��;reaE�
•l-3.1�:�}F3[)-----Dra�na�e-�y�er�--l�y�a
8 111i eat
d-ae-#k3w=frc3rir a1! trek•ear-a��a€-arsfi�€-�r-o�c�GSi�rl-l�ey{reitc:y--a:�s�€��fF�.that-tlae-lar�ci-i�;
in-€rf�€�l-}��ea+-elo�eEi-state-t€€pier pi�ese€�t•rti x}i1��r�:�ir��'t�e�sr�t�kr�c�e�a
eona -sh-a-11-be uotnputed-utilizing-a-runalf-:oeffieient
(-}f-not- An-a•Elowanee-w-11 ch
upstream-ciete-n#it}ta-erred tease ate lairpreviously-been-appr-oved-by-the-V4[ag�L-and
e�idet�ce 3 t its LCx strut ti rk Baal be-shown.
"1�1-i�-cl�xtH�t��ll-rr�i� r-�cp�rE•rc��l�a-11���Ltlutt-��e�ssary-t4�--)-�aEtd-lam--the--rl->3�3-1-��-a
c�El rEdE'ed-yeas f= Ii {mill—fc�i airya��clX11�i rLi MR -ly--devek)ped-drainage
Mica-trilruta�y-l�r-the iese�r r,-le ra�Il� discl�ar eel ci�xixlx lz"e same tit�irat tli�
al�pro�+e�lea r e—The live dekel3ti N t
to be-provided shallbe-cal"law-1-on41ie
ha o#'the t�E e-h E�rt d-y-em�i E-i4-t-at+-year li li-shed-by 41L, :S-.
W eatk�=I--I�-E� �-the-Gli ic;�#;r�area:
1-�I-2:1 414}—Detei}t�tx-rfae�-li t��S--A�-�}v��thet•i-ti-es-•desi���ater�
Deten-ti xn la F�itees f�3I det ek313���es�t %tl�il� the G[�c�L� Cf3�rl�ty pe}tif3�rof t1Ee
V�l-l-age-�h�tll•-lie-s{Eb�c�t�Hhe-��l�r��l-c�-€�41te-1�etr�rpoli�i�1-WaEe�=�eclart}atit�n-D•i3t•I'ict-
Alltletentiot�-iaclit3es wrfihjx tdie- il1a� arLzs�tbjeei tcti the appr�,�rala�tei11ae
E+igifleer.-
De!;ib•s-ff r-feIx i�r�er xaEtlEriient slt�pe depth perr��arEerrt poE�ls:-protectinr t+f
ix#e�a��}rrtlets;�creerrfx�s;pl�y�al�-1�a-pe�rnd--appea�a�xe--s1•�a�t�e-aa-dete�riii�ed-arid
approved4y4-he-414-age-Engi neef-
Section 4. Section 13.12.115 of the Buffalo Grove Municipal Code is hereby amended
to read as follows:
13.12.115 - Adoption of the Metropolitan Water Reclamation District of Greater Chica gat
Watershed Managenicnt Ordinance and the Lake County Stormwater Management
Commission's Watershed Development Ordinance by reference.
The provisions of Metropolitan Water Reclalnatlon District of Greater Chica ro's
Watershed ManaEjc=Lit_Ordinance, latcst edition_ and the Lake County Stormwater
Managq,Inent Commission's- aters ed Development Ordinance, latest edition, as
appro,vL-d4"e_-h-ake•County-Bkiaa.-d et,-JtHie 1-X2(•11-3,, area opted herein by reference.
In case of conflict between the provisions of these Ordinances' L=:ke••C0Lfl,,ty-WateF.g4ed
Deverr�eiC]rcli� ar�e
and any other provisions of the Buffalo Grove Municipal Code,
the most stringent provisions shall apply.
Section 5. Section 15.24.060, Application, and Section 15.24.140, Handbook adopted
by reference, of the Buffalo Grove Municipal Code are hereby amended to read as follows:
Chapter 15.24 - SOIL EROSION SEDIMENTATION CONTROL
1524.060 - Application.
A. No site development or building permit shall be issued until the applicant submits an
acceptable site development plan and certifies that any land-clearing construction or
development involving the movement of earth shall be in accordance with such plan.
R Each application for a site development permit shall be made by the owner of the property
or his authorized representative to the Village Engineer and shall be accompanied by a site
development plan consisting of the following, unless the Village Engineer finds any item
unnecessary to insure compliance with the provision of this Chapter; provided; however,
that no exemption from subsection A of this section shall be granted to any applicant who
intends to move in excess of five hundred cubic yards of dirt:
I. With respect to site developments, a vicinity sketch, showing acreage of site, boundary
line survey, zoning, type of proposed sewer and water facilities, location of existing
utilities, buildings and drains on and within one hundred and fifty feet of the site,
together with a legend and scale. There shall be included on or with such a vicinity
sketch:
a. A soil map oft e subject property showing the predominant soil types on the site,
b.
Info do regarding those areas abutting or adjacent to the site sufficient to
shown existing drainage pattern and the drainage course that may affect, or be
affected by the development of the site,
c. The name and address of the developer and owner,
d. The name and address of any consulting firm retained by the applicant, together
with the name of the applicant's principal contact at such firm,
e. Limits of regulatory floodplain(s),
f. Areas to be sodded, seeded, mulched or paved,
g. Acreage of area to be vegetatively stabilized, if any,
h. Areas to be left undisturbed,
2. With respect to site grading, a grading plan showing the site and one hundred fifty foot
adjacent peripheral strip, proposed contours at one-foot intervals, and-fi nal grades, and
street profiles.;-a-nd-an-i ndicitt and
fill-.sltd su f-ac-e-ru ii(4'fi,
3. Storinwater Management Plaii per-ft requirements of the Watershed Developiliell
Ordinance (WDOI and the Watershed Management Ordinance _(_VMQ) including a soil
erosion and sediment control elan shall be submitted to the Village En2ineer for
anDroval orior to begitiniiig
any work. A soil erosion and sediment control olan shall
include, but not be limitedto, the requirements of the WHO or WMO, or as requited by
the Village Eli *d4nt-a
a.:- -bare-eailth.-or--vegetated-,
b—. Wliether-the,coristizuet-od ou-fl et-w-I fl-be -4u+I-TP4)e11--s liade4 017-den,&,had�
6
�teti�ely.eroding-,
!' W-1 3et#�L�-t��c�tt�kti•4L�1��L�c:�t�r see}���e�i��r-ill-]��;
k 14 xEr a e-�ielt�aa c rtle�tHi a S:t3 �i� ri r :t r tt�ir�c#ii ate -the -aat-ura1-gm4iei-x-M4h-e
aeee'pt-i3-fg-naturt{1$ii ��' F3f�E33 Sti'i'i�I37-��eki7HL'
j--f�c�ilc#i{iesagi�alxi r r ri€ atiai}s € rr-all e es soddec H aar ear t�cr���� ,f{Ftt�ie� atKI
4ftiil fr-water
4: Estimated i> --te-sfl-iedkde,ai.i # phasing-E"evelopmenl-ri=tl3e rte:
Aiase4 Stm ppi-figs-aild/kmF- -ariag
Phase-14 Rough gi-ading and ot--v;tr-Lwtton
hale T'' t We-establisilmenI
r°t4-eras]Err -aild--setktterA-eoflt o-P#mis in or-apProva-i
sl�ra�l s#3t�w all-tfie e3t�siet3 a�}c se�i i��ci�>` € 1measures -needed-tor-ffc,)side--pr4-)teetk-m
t)�rH� #xirit r}#� t €e phase stt IC�icrl}-listen a��l e=i l se lams-9hal."Iso-ii olude-a€ly
site rH ld s��ri1 a ert4; e --i€tt�ity #irte4 ii + l-ai�� aeeess raEi ai c �t�rii
fu-rthef-i dieate.
aTl dxit �� i�g ���e site w leg{r�;
kr: —B- ii-rcHS�Ire Sri�li3t��i aitt
E—��-l:Ttc'I�i�t�E3Ft-43�-tt'[T��3H1�F�f�ii�le�LiETF1ti"i3� 11 7E?`r€�iL-!i'L'S-�'FEL'� �i���}3f�ti�FE€i-:t�1Fc��3-�3�
Abase and-date;
t—Ln-A,a]-fatif}Faf}( tE}rm (irai-1utge-'-by pl-ta-se-aiid- raft',
e: --Pav-i-xg o r.stfeL axEl �rr#Ci�1b a�e��, i i y;�asr�atl�l-slat ;
l�kt-al-}�i�ii��ei�€ cr�ti-i-��ai�ei�,+t-*ge-Native-etwel'-E��a€ts wi#1-s�1ew�I�at-w-i-1-��c'--c�Hi�e-tom
s#Hi-tei>-tk rya€-at}c�i�c�l�e e .;=di:;t3wbed--ar-c;as ading as
j�rvssil7le�i t i fir g-seedif} r ii�ctis-a d--i1ates;-type--()1 red; ..seedbed-preparuti+ml3
7
seedi-ng dales;I3inE �c t lifer a{�pliea if3€� rate t�{�r}}e�I Fy seed rgs f' c 'cl el
g-- Det it
Ii.- - Got"ut-atiaas-foe
54. For the purpose of exemplifying the considerations and factors which should enter into
the preparation of a site development plan, the standards and requirements of the 111jilois
Urban Manual published by the Association of Illinois Soil and Water Conservation
Districts. latest edition, shall be used or as determined by the Villa
Eng,i necr. -and and-Std-imentat4OM---�ntr-GP
1.987-anti-lie "Proc-ed*i--es
and Stiindar-dq—tot�-Ur-bari--Sol-I
{pub 1ished.-M-4-ilia wle&
15.24.140 - Handbooks adopted by reference.
The Illinois Urban Manual published bv the Association of Illinois Soil and Water
Conservation Districts, latest edition, is
osi on ami-8ekhment-alio.a
incorporated into this Chapter and
made a part hereof by this reference for the purpose of delineating procedures and
methods of operation under development plans approved in this Chapter. In the event of
conflict between provisions of said "handbooks" and other provisions of this Chapter, the
said provisions of this Chapter shall govern.
Section 6, Section 18.20.020, New Development Standards, of the Buffalo Grove Municipal
Code is hereby amended to read as follows:
18.20.020 - New development standards.
All new developments shall have:
A. The proposed site oft e structure filled so that the elevation of the top of the foundation or
lowest point of water entry for the structure is at the FP E;
B. Basements, cellars or crawl spaces made of concrete, structurally adequate, poured in place
with no openings below FPE except for openings for utilities which shall be sealed, floodproofed
and made watertight in a manner acceptable to the Building Commissioner;
C. A door sill, window sill or the base of any other opening in the outer walls of a structure or
any gravity connected sewer opening constructed at an elevation not lower than the FPE, except
at the point of access for an interior truck dock which must be at least one and one-half feet
above the base flood elevation;
8
D. All structures floodp roofs d, watertight and designed to prevent sewer backup and
groundwater seepage according to standards approved byte Building Commissioner;
E- 'Tile el evali o 11 0 f tile g"01-1 II(I ror a m I11-1j n o m d-I staii Ee-o f t w ell ty-1-1 ve Fect-i ill ill c(l I ately
S LI ITOU 11(1 ill"I ii Ily 1)LI i Id i ii g or m-m ctmrc-erec loci or ii mved wl t li I n or actj ac eii t to a S 1'.1,1 A a I an
CI ev at 10 11 W11 i U11 Is ilot I CS s t II all 0 lie foot al)o ve-t1i c lase flood ul iCwat i o n and no port[oil o1 the lot
or parcel I)o1ow Uic base flood clevat'10,11.
Section 7. This Ordinance shall be in full force and effect from and after its passage,
approval and publication.
AYES: 6-Berman, Trillirig- Stein, Ottenheirrier, Weiderifeld,Johnson
NAYS: 0 - None
ABSENT: 0 -None
PASSED: March 21, 2016.
APPROVED: March 21, 2016.
APPROVED:
Beverly Suss 'Village President
ATTEST:
Janet Sirablan, Village Clerk
9