Loading...
BIDTAB Sidewalk 2015Village of Buffalo GroveFinance Department Sidewalk Project 2015 Tabulation GA Paving LLC Globe Construction D'Land Construction L.L.C.Lorusso Cement Contractors, Inc.Mondi Construction, Inc.Schroeder & Schroeder INC.Suburban Concrete, Inc. Bid Opening: April 7, 2015 1100 S 25th Ave.1781 W. Armitage Court 600 S. County Line Road, #1N 1090 Carolina Drive 1827 Blackhawk Dr.7306 Central Park 21227 W. Commercial Dr. Ste B Bellwood, IL 60104 Addison, IL. 60101 Bensenville, IL. 60106 West Chicago, IL.60185 West Chicago, IL. 60185 Skokie, IL. 60076 Mundelein, IL. 60060 Bid Bond:Yes Yes Yes Yes Yes Yes Yes Signed Proposal Form:Yes No Yes Yes Yes Yes Yes Signed Public Contract Statements:Yes Yes No Yes Yes Yes Yes Contract Modifications Requested No No No No No No No Removal and Replacement of Sidewalk $219,862.50 $251,842.50 $259,837.50 $299,812.50 $167,095.50 $227,058.00 $195,477.75 39975 SQ FT $5.50 $6.30 $6.50 $7.50 $4.18 $5.68 $4.89 Detectable Warnings $3,075.00 $2,972.50 $4,100.00 $3,690.00 $2,870.00 $8,610.00 $3,895.00 205 SQ FT $15.00 $14.50 $20.00 $18.00 $14.00 $42.00 $19.00 Removal & Replacement Curb & Gutter B-6.12 $7,364.00 $5,880.00 $9,800.00 $6,720.00 $5,040.00 $6,160.00 $5,460.00 280 feet $26.30 $21.00 $35.00 $24.00 $18.00 $22.00 $19.50 Removal & Replacement Curb & Gutter B-6.24 $1,800.00 $1,440.00 $2,700.00 $1,680.00 $1,440.00 $2,100.00 $1,500.00 60 feet $30.00 $24.00 $45.00 $28.00 $24.00 $35.00 $25.00 Removal & replacement 6" Driveway $9,000.00 $9,150.00 $11,250.00 $11,250.00 $6,000.00 $9,450.00 $6,750.00 150 SQ YD $60.00 $61.00 $75.00 $75.00 $40.00 $63.00 $45.00Class B Patches 10 inch $5,520.00 $2,680.00 $4,000.00 $5,200.00 $2,800.00 $3,200.00 $2,800.00 40 SQ YD $138.00 $67.00 $100.00 $130.00 $70.00 $80.00 $70.00 Removal & Replacement Asphalt Driveway $3,240.00 $2,475.00 $4,500.00 $1,530.00 $2,565.00 $2,160.00 $2,430.00 45 SQ YD $72.00 $55.00 $100.00 $34.00 $57.00 $48.00 $54.00 Drainage & Utility Structures Adjusted $1,200.00 $700.00 $2,000.00 $1,000.00 $1,000.00 $1,500.00 $1,000.00 4 each $300.00 $175.00 $500.00 $250.00 $250.00 $375.00 $250.00 Tree Root Pruning $14,000.00 $10,080.00 $24,500.00 $12,495.00 $5,600.00 $10,500.00 $7,700.00 140 each $100.00 $72.00 $175.00 $89.25 $40.00 $75.00 $55.00 Sidewalk Base Preparation $6,048.00 $2,100.00 $9,100.00 $7,000.00 $2,800.00 $10,500.00 $9,100.00 140 each $43.20 $15.00 $65.00 $50.00 $20.00 $75.00 $65.00 Topsoil and seed with Blanket $1,111.10 $2,337.00 $4,100.00 $2,050.00 $2,050.00 $3,280.00 $2,460.00 410 SQ YD $2.71 $5.70 $10.00 $5.00 $5.00 $8.00 $6.00Traffic Control & Protection $5,000.00 $6,300.00 $12,500.00 $6,500.00 $8,000.00 $4,500.00 $2,000.00 lump sum TOTAL COST $277,220.60 $297,957.00 $348,387.50 $358,927.50 $207,260.50 $289,018.00 $240,572.75 $0.00