1994-021O O
ORDINANCE NO. 94- 21
AN ORDINANCE AMENDING SECTION 13.04.190 AND 13.04.290 OF
TITLE 13 OF THE VILLAGE OF BUFFALO GROVE MUNICIPAL CODE
WHEREAS, the Village of Buffalo Grove is a Home Rule Unit pursuant to
the Illinois Constitution of 1970; and
WHEREAS, the Village of Buffalo Grove has determined that it is necessary
to revise its user rates and fees for the operational and maintenance expenses
incurred within the Waterworks and Sewerage Fund, along with the debt servicing
charges also incurred within the Fund; and
WHEREAS, the Village of Buffalo Grove has prepared a Municipal Water
Policy /Rate Study which was adopted by the President and Board of Trustees on
November 15, 1982 and amended on July 18, 1983, the methodology of which lead to
the development of the following rate and fee structure; and
WHEREAS, the following rates and fees will be required to properly fund the
budgeted operational and maintenance expenses and debt servicing requirements for
the fiscal year to begin on May 1, 1994.
NOW, THEREFORE BE IT ORDAINED BY THE PRESIDENT AND BOARD OF TRUSTEES OF
THE VILLAGE OF BUFFALO GROVE, COOK AND LAKE COUNTIES, ILLINOIS, the
following:
SECTION 1. Section 13.04.190, Rates, Subsections B,C,D,E, and F of the
Village of Buffalo Grove Municipal Code are amended to read as follows:
B. In addition to the charges set forth in Subsections C through F, each
user /consumer of water service shall be billed and pay bimonthly at
the rate of one dollar and fifty -seven cents ($1.57) per one thousand
gallons of water consumed.
C. A basic charge of seventy -five cents ($.75) per month to each
user /consumer of water service in both Cook County and Lake County
portions of the Village, which charge is necessary for the purpose of
fulfilling the obligation of the debt service and reserve account
requirements of outstanding combined water and sewer revenue bond
ordinance of the Village.
D. A basic charge of sixty cents ($.60) per month to each user/ consumer
of water service in both Cook County and Lake County portions of the
Village, which charge is necessary for the purpose of fulfilling the
obligation of the debt service requirements of the outstanding
Corporate Purpose Bonds - Series 1981 general obligation bonds
authorized under Village Ordinance No. 81 -19.
0 0
E. A basic charge of three dollars and ninety -five cents ($3.95) per
month to each user /consumer of water service in both Cook County and
Lake County portions of the Village, which charge is necessary for the
purpose of fulfilling the obligation of the debt service requirements
of the outstanding Corporate Purpose Bonds - Series 1984 general
obligation bonds authorized under Village Ordinance No. 84 -23.
F. A basic charge of three dollars and eighty cents ($3.80) per month to
each user /consumer of water service in both Cook County and Lake
County portions of the Village, which charge is necessary for the
purpose of fulfilling the Village's contractual obligation for debt
servicing requirements of the Northwest Water Commission revenue bonds
authorized for the completion of the capital construction of the
Commission's Transmission System.
SECTION 2. Section 13.04.290, Sewer Use Charge, Subsection E' User Charges
Rate, of the Village of Buffalo Grove Municipal Code is amended to read as
follows:
E. User Charge Rate. The following unit charge shall be applied to
each user's billable flow:
1. The basic unit charge for operation, maintenance and replacement
shall be twenty -three cents ($.23) per one thousand gallons of
water consumed.
2. The bimonthly fixed rate for all non - metered residential users
shall be four dollars and fourteen cents ($4.14) per bi- monthly
period.
SECTION 3. This ordinance shall be in full force and effect from and after
its passage and approval in the manner provided by law as of May 1, 1994.
AYES: 6 - Marienthal, Reid, Kahn, Rubin, Braiman, Hendricks
NAYES: 0 - None
ABSENT: _0 - None
PASSED: April 18 1994.
APPROVED: April 18 1994.
Village 11resident
ATTEST:
Vill e Clerk
- 2 -
A
ORDINANCE NO. 94- 21
AN ORDINANCE AMENDING SECTION 13.04.190 AND 13.04.290 OF
TITLE 13 OF THE VILLAGE OF BUFFALO GROVE MUNICIPAL CODE
WHEREAS, the Village of Buffalo Grove is a Home Rule Unit pursuant to
the Illinois Constitution of 1970; and
WHEREAS, the Village of Buffalo Grove has determined that it is necessary
to revise its user rates and fees for the operational and maintenance expenses
incurred within the Waterworks and Sewerage Fund, along with the debt servicing
charges also incurred within the Fund; and
WHEREAS, the Village of Buffalo Grove has prepared a Municipal Water
Policy /Rate Study which was adopted by the President and Board of Trustees on
November 15, 1982 and amended on July 18, 1983, the methodology of which lead to
the development of the following rate and fee structure; and
WHEREAS, the following rates and fees will be required to properly fund the
budgeted operational and maintenance expenses and debt servicing requirements for
the fiscal year to begin on May 1, 1994.
NOW, THEREFORE BE IT ORDAINED BY THE PRESIDENT AND BOARD OF TRUSTEES OF
THE VILLAGE OF BUFFALO GROVE, COOK AND LAKE COUNTIES, ILLINOIS, the
following:
SECTION 1. Section 13.04.190, Rates, Subsections B,C,D,E, and F of the
Village of Buffalo Grove Municipal Code are amended to read as follows:
B. In addition to the charges set forth in Subsections C through F, each
user /consumer of water service shall be billed and pay bimonthly at
the rate of one dollar and fifty -seven cents ($1.57) per one thousand
gallons of water consumed.
C. A basic charge of seventy -five cents ($.75) per month to each
user /consumer of water service in both Cook County and Lake County
portions of the Village, which charge is necessary for the purpose of
fulfilling the obligation of the debt service and reserve account
requirements of outstanding combined water and sewer revenue bond
ordinance of the Village.
D. A basic charge of sixty cents ($.60) per month to each user/ consumer
of water service in both Cook County and Lake County portions of the
Village, which charge is necessary for the purpose of fulfilling the
obligation of the debt service requirements of the outstanding
Corporate Purpose Bonds- Series 1981 general obligation bonds
authorized under Village Ordinance No. 81 -19'.
E. A basic charge of three dollars and ninety -five cents ($3.95) per
month to each user /consumer of water service in both Cook County and
Lake County portions of the Village, which charge is necessary for the
purpose of fulfilling the obligation of the debt service requirements
of the outstanding Corporate Purpose Bonds- Series 1984 general
obligation bonds authorized under Village Ordinance No. 84 -23.
F. A basic charge of three dollars and eighty cents ($3.80) per month to
each user /consumer of water service in both Cook County and Lake
County portions of the Village, which charge is necessary for the
purpose of fulfilling the Village's contractual obligation for debt
servicing requirements of the Northwest Water Commission revenue bonds
authorized for the completion of the capital construction of the
Commission's Transmission System.
SECTION 2. Section 13.04.290, Sewer Use Charge, Subsection E, User Charges
Rate, of the Village of Buffalo Grove Municipal Code is amended to read as
follows:
E. User Charge Rate. The following unit charge shall be applied to
each user's billable flow:
1. The basic unit charge for operation, maintenance and replacement
shall be twenty -three cents ($.23) per one thousand gallons of
water consumed.
2. The bimonthly fixed rate for all non - metered residential users
shall be four dollars and fourteen cents ($4.14) per bi- monthly
period.
SECTION 3. This ordinance shall be in full force and effect from and after
its passage and approval in the manner provided by law as of May 1, 1994.
AYES: 6 - Marienthal, Reid, Kahn, Rubin, Braiman, Hendricks
NAYES: 0 - None
ABSENT: _0 - None
PASSED: April 18 1994.
APPROVED: April 18 1994. f
Village Otesident
ATTEST:
Vill(ade Clerk
- 2 -