Loading...
2004-084ORDINANCE NO. 2004- 84 AN ORDINANCE AMENDING TITLE 15 OF THE VILLAGE OF BUFFALO GROVE MUNICIPAL CODE PERTAINING TO PERMIT FEES WHEREAS, the Village of Buffalo Grove is a Home Rule Unit by virtue of the provisions of the Constitution of the State of Illinois of 1970; and WHEREAS, permit fees have not been increased since 1997 and to offset the costs, including but not limited to, plan reviews and field inspections, the Village has determined an increase in permit fees is necessary. NOW, THEREFORE, BE IT ORDAINED BY THE VILLAGE PRESIDENT AND BOARD OF TRUTEES OF THE VILLAGE OF BUFFALO GROVE, COOK AND LAKE COUNTIES, ILLINOIS: SECTION 1: Subsection 112.3.1 of section 15.040.020 of the Village of Buffalo Grove Municipal Code is hereby amended to read as follows: Chapter 15.04 BUILDING CODES 15.04.020 AMENDMENTS Section 112.3.1 Fee schedule. (Amend to read as follows) A fee for each plan examination, building permit and inspection shall be paid prior to the issuance of permit(s) in accordance with the following schedule: A. Building Permit Fees: For construction valuation of $1,000 or less, the fee will be $35.00. For construction valuation over $1,000, the fee will be $35.00 for the first $1,000, plus $10.00 for each additional $1,000 or fraction thereof through $20,000. For construction valuation over $20,000, the fee will be $235.00 for the first $20,000, plus $10.00 for each additional $1,000 or fraction thereof. Decks /Sheds /Gazebos - $50.00 base fee plus $.10 per sq. ft. (not including any electrical fees). B. Building Plan Review Fees: Building volume (ft.3) 0 Plan Review Fee Through 1,000 1,001 through 5,000 5,001 through 10,000 10,001 through 25,000 25,001 through 50,000 50,001 through 100,000 100,001 through 150,000 150,001 through 200,000 Over 200,000 • $35.00 55.00 70.00 95.00 125.00 155.00 185.00 215.00 $215.00 plus $3.00 per 10,000 cubic feet in excess of 200,000 cubic feet or any part thereof Alterations and remodeling where it is impractical to compute plan review fees on a cubic foot basis, the fee shall be .25% (.0025) of the valuation of the work to be performed. The minimum plan review fee shall be $35.00. 2. Plumbing Bond — Required: Any person engaging in the business of plumbing installations in the Village shall execute and file with the building official a surety bond payable to the Village, in the sum of ten thousand dollars ($10,000). This bond must remain in full force and effect while any plumbing work is being performed in the Village. Plumbing Contractor Requirements: Any person engaging in the business of plumbing installations in the Village shall provide a copy of their current plumbing license and a copy of their current State of Illinois Contractor Registration. Sewer Contractor Bond — Required: In cases where the sewer repair is not being done by a plumbing contractor the contractor is required to provide a ten thousand dollar ($10,000) surety bond made payable to the Village of Buffalo Grove. 3. Plumbing Permit Fees: Water Heater Each sump pump pit Each sewer service Each water service Each water meter Each clean out Each plumbing fixture or opening not listed In- ground swimming pool $35.00 15.00 15.00 15.00 15.00 10.00 2 10.00 40.00 Lawn sprinkler system 3.00 /head 55.00 minimum Sewer repair 45.00 Minimum plumbing fee 35.00 Plan review fee $35.00 or 25% of building plan review fee — whichever is greater 4. Electrical Contractor Registration — Required: (a) Registered Electricians and/or Electrical Contractors: (Amend to read as follows) It shall be unlawful for any person to engage in the business of electrical contractor, without being registered as an electrician or an electrical contractor. If such person is registered for the current year in another city or village within the State of Illinois, in conformity with the state statutes, such electrician or electrical contractor shall be required to show proof of such registration. The term "registered electrician" as used in this section shall be understood to mean any person installing or altering electrical equipment for the utilization of electricity supplied for light, heat or power, not including radio apparatus or equipment for wireless reception of sounds and signals, conductors and other equipment installed under the jurisdiction of the Illinois Commerce Commission, for use in their operation as public utilities; but the term "registered electrician" does not include employees of an electrical contractor who perform or supervise work. The Corporate Authorities, by virtue of the Illinois Compiled Statutes, requires candidates for electrical registration to successfully complete a written examination administered by the Village Electrical Commission. (b) Home Owners: The requirement for a registered electrician may be waived with special permission from the Director of Building and Zoning or Electrical Inspector. (c) Where a registered electrician or electrical contractor is found doing electrical work without a permit on two (2) separate occasions within any twelve (12) month period, a hearing shall be held by the Electrical Commission, in the presence of the Electrical Inspector, at which time the permit privileges of said electrician or electrical contractor may be suspended for a period of time not to exceed one (1) year. (d) In cases of emergency, the Electrical Inspector has the authority to disconnect current to any electrical equipment found to be unsafe. 5. Electrical Permit Fees: (a) The fees for fifteen- ampere and twenty- ampere two -wire and three -wire circuits, including fixtures, sockets or receptacles, are as follows: 3 • Circuits 15 AMP 20 AMP 1 $10.00 $15.00 2 15.00 20.00 3 20.00 30.00 4 30.00 40.00 5 35.00 45.00 6 40.00 55.00 7 45.00 60.00 8 50.00 70.00 9 55.00 75.00 10 60.00 85.00 11 65.00 90.00 12 70.00 95.00 13 75.00 105.00 14 80.00 110.00 15 85.00 115.00 16 90.00 125.00 17 95.00 130.00 18 100.00 135.00 19 105.00 145.00 20 110.00 150.00 21 115.00 155.00 22 120.00 160.00 23 125.00- 165.00 24 130.00 170.00 25 135.00 175.00 Each $4.00 $5.00 additional additional additional circuit over 25 over 25 circuits circuits (b) For thirty (30) amp circuit - double the amount of 15 amp circuit For forty (40) amp circuit - double the amount of 20 amp circuit For fifty (50) amp circuit - triple the amount of 15 amp circuit For sixty (60) amp circuit - triple the amount of 20 amp circuit 0 (c) For services, including service revisions, the fee shall be: 100 amp $35.00 101 through 200 amp 45.00 4 • 401 through 800 amp 100.00 801 through 1199 amp 130.00 1200 through 4000 180.00 4001 through 800 amp 240.00 (d) For feeder circuits, the fees shall be: 60 through 100 amp $20.00 101 through 200 amp 35.00 201 through 400 amp 50.00 401 through 600 amp 70.00 601 through 1000 amp 95.00 1001 through 2000 amp 115.00 0 (e) Motors: The fee for a motor 3/4 horsepower or over shall be $15.00 for the first and $10.00 for each additional, plus the circuit fee. Except for residential units, the fee for a motor less than 3/4 horsepower shall be $5.00 each, plus the circuit fee. (f) Additional systems fees are as follows: System Fee Audio communications $35.00 Burglar alarm 35.00 Electronic computer /data processing Fire alarm system Intercom & public address system Relocatable wired partitions Temporary wiring 35.00 60.00 35.00 per system 35.00 35.00 (g) In all installations, except signs, the minimum fee shall be $35.00. (h) Electrical permit fees for sign installations shall be based on circuit count in subsection (a) above. (i) Minimum plan review fee shall be $35.00 or twenty -five percent (25 %) of the building plan review fee - whichever is greater. 6. Mechanical Contractor License -- Required: Any person engaging in the business of heating, air conditioning or refrigeration contracting shall be licensed by the Village. Upon the filing of such application for license with the building official and the receipt of a surety bond payable to the Village in the sum of ten thousand dollars ($10,000), which must remain in full force and effect while any heating, air conditioning and refrigeration work is being performed, and the • 0 payment of the license fee of fifty dollars ($50), the building official shall issue a license for the calendar year in which it is issued. 7. Mechanical Permit Fees: Heating: Residential - New or replacement unit $40.00 All other uses (new installations) per 2,000 sq. ft. or fraction thereof 40.00 Air Conditioning: (Window units not included) Residential - New or replacement unit $35.00 All other uses (new installations) per 2,000 sq. ft. or fraction thereof 35.00 Minimum mechanical fee 35.00 Plan review fee $35.00 or 25% of building plan review fee - whichever is greater 8. Elevator Permit Fees: New installation: $125.00 Each elevator, dumbwaiter, Moving walk, escalator, conveyor or manlift (includes initial inspection) Semi - Annual Inspections/ 75.00 per inspection Certificate of Compliance Each elevator, dumbwaiter, Moving walk, escalator, conveyor or manlift Repairs and reinspections 75.00 per inspection Plan review fee: Each elevator, conveyor, dumbwaiter, moving walk, 2 escalator or manlift for buildings of four (4) stories or less 175.00 Additional fee per floor for every story above four (4) stories 10.00 9. Fire Protection System Fees: Automatic sprinkler system: Each system, 1 -- 100 sprinklers $100.00 Every 100 additional heads or fraction thereof 25.00 Automatic sprinkler system (dry system): Each system, 1 -- 100 sprinklers $125.00 Every 100 additional heads or fraction thereof 25.00 Automatic sprinkler system (pre action): Each system, 1 -- 100 sprinklers $125.00 Every 100 additional heads or fraction thereof 25.00 Partial system on the domestic water system 50.00 Standpipes: Each standpipe system 30.00 Fire pumps: Each pump, regardless of size 50.00 Fire alarm system: Manual or automatic system 60.00 Hood suppression systems: Each system regardless of size 30.00 Clean agent extinguishing systems: Each system regardless of size 50.00 Alternate fire extinguishing systems: Each system regardless of size 50.00 Means of egress access control systems: Each system regardless of size 50.00 7 0 Plan review fee for all systems: 50.00 10. Swimming Pool Fees: Above - ground pools - Initial installation, enlargement, or alteration $35.00 In- ground pools shall comply with building fee schedule. The installation permit fee shall be in addition to any electrical or plumbing fees that may be required. 11. Health Department Plan Review Fees: Plan review fees for the Health Department shall be $35.00 or 25% of building plan review fee -- whichever is greater. 12. Reinspection Fees: The aforementioned permit fees include one (1) reinspection. Any inspection or reinspection not covered by the fees designated in this section shall be charged at $50.00 per inspection per hour or any part of an hour. 13. Work Prior to Permit: Where work has been started prior to the issuance of a permit, the normal permit fee shall be doubled with a minimum of $35.00 and a maximum of $1,000.00. 14. Certificate of Occupancy The fee for Certificate of Occupancy, including Business License inspections, shall be as follows: Residential (per unit) $50.00 Non - Residential (per unit) 100.00 SECTION 2: Any person violating the provisions of this Ordinance shall be punished according to the provisions of Chapter 1.08 General Penalty. SECTION 3: This Ordinance shall be in full force and effect from and after its passage, approval and publication. This Ordinance may be published in pamphlet form. 8 AYES: 6 - Braiman, Glover, Berman, Johnson, Kahn, Trilling NAYES: 0 - None ABSENT: 0 - None PASSED: August 30 , 2004 APPROVED: August. 30 , 2004 PUBLISHED: August 31 , 2004 ATTEST: Village Clerk APPROVED: Village President E • 'b STATE OF ILLINOIS ) ss. COUNTY OF COOK ) CERTIFICATE I, Janet M. Sirabian, certify that I am the duly elected and acting Village Clerk of the Village of Buffalo Grove, Cook and Lake Counties, Illinois. I further certify that on August 30, 2004 the Corporate Authorities of the Village passed and approved Ordinance No. 2004 -84 entitled: AN ORDINANCE AMENDING TITLE 15 OF THE VILLAGE OF BUFFALO GROVE MUNICIPAL CODE PERTAINING TO PERMIT FEES provided by its terms that it should be published in pamphlet form. The pamphlet form of Ordinance No. 2004 -84, including the Ordinance and a sheet thereof, was prepared, and a copy of such Ordinance was posted in and at the Village Hall, commencing August 31, 2004, and continuing for at least ten days thereafter. Copies of such Ordinance were also available for public inspection upon request in the Office of Village Clerk. Dated at Buffalo Grove, Illinois, this 31st day of August, 2004. Village Jerk �o / d� L� By F_ F; ORDINANCE NO. 2004-84 AN ORDINANCE AMENDING TITLE 15 OF THE VILLAGE OF BUFFALO GROVE MUNICIPAL CODE PERTAINING TO PERMIT FEES WHEREAS, the Village of Buffalo Grove is a Home Rule Unit by virtue of the provisions of the Constitution of the State of Illinois of 1970; and WHEREAS, permit fees have not been increased since 1997 and to offset the costs, including but not limited to, plan reviews and field inspections, the Village has determined an increase in permit fees is necessary. NOW, THEREFORE, BE IT ORDAINED BY THE VILLAGE PRESIDENT AND BOARD OF TRUTEES OF THE VILLAGE OF BUFFALO GROVE, COOK AND LAKE COUNTIES, ILLINOIS: SECTION 1: Subsection 112.3.1 of section 15.040.020 of the Village of Buffalo Grove Municipal Code is hereby amended to read as follows: Chapter 15.04 BUILDING CODES 15.04.020 AMENDMENTS Section 112.3.1 Fee schedule. (Amend to read as follows) A fee for each plan examination, building permit and inspection shall be paid prior to the issuance of permit(s) in accordance with the following schedule: 1. A. Building Permit Fees: For construction valuation of $1,000 or less, the fee will be $35.00. For construction valuation over $1,000, the fee will be $35.00 for the first $1,000, plus $10.00 for each additional $1,000 or fraction thereof through $20,000. For construction valuation over $20,000, the fee will be $235.00 for the first $20,000, plus $10.00 for each additional $1,000 or fraction thereof. Decks /Sheds /Gazebos - $50.00 base fee plus $.10 per sq. ft. (not including any electrical fees). Building volume (ft.3) Plan Review Fee Through 1,000 1,001 through 5,000 5,001 through 10,000 10,001 through 25,000 25,001 through 50,000 50,001 through 100,000 100,001 through 150,000 150,001 through 200,000 Over 200,000 $35.00 55.00 70.00 95.00 125.00 155.00 185.00 215.00 $215.00 plus $3.00 per 10,000 cubic feet in excess of 200,000 cubic feet or any part thereof Alterations and remodeling where it is impractical to compute plan review fees on a cubic foot basis, the fee shall be .25% (.0025) of the valuation of the work to be performed. The minimum plan review fee shall be $35.00. 2. Plumbing Bond — Required: Any person engaging in the business of plumbing installations in the Village shall execute and file with the building official a surety bond payable to the Village, in the sum of ten thousand dollars ($10,000). This bond must remain in full force and effect while any plumbing work is being performed in the Village. Plumbing Contractor Requirements: Any person engaging in the business of plumbing installations in the Village shall provide a copy of their current plumbing license and a copy of their current State of Illinois Contractor Registration. Sewer Contractor Bond — Required: In cases where the sewer repair is not being done by a plumbing contractor the contractor is required to provide a ten thousand dollar ($10,000) surety bond made payable to the Village of Buffalo Grove. 3. Plumbing Permit Fees: Water Heater Each sump pump pit Each sewer service Each water service Each water meter Each clean out Each plumbing fixture or opening not listed In- ground swimming pool $35.00 15.00 15.00 15.00 15.00 10.00 2 10.00 40.00 Lawn sprinkler system 3.00/head 55.00 minimum Sewer repair 45.00 Minimum plumbing fee 35.00 Plan review fee $35.00 or 25% of building plan review fee — whichever is greater 4. Electrical Contractor Registration — Required: (a) Registered Electricians and /or Electrical Contractors: (Amend to read as follows) It shall be unlawful for any person to engage in the business of electrical contractor, without being registered as an electrician or an electrical contractor. If such person is registered for the current year in another city or village within the State of Illinois, in conformity with the state statutes, such electrician or electrical contractor shall be required to show proof of such registration. The term "registered electrician" as used in this section shall be understood to mean any person installing or altering electrical equipment for the utilization of electricity supplied for light, heat or power, not including radio apparatus or equipment for wireless reception of sounds and signals, conductors and other equipment installed under the jurisdiction of the Illinois Commerce Commission, for use in their operation as public utilities; but the term "registered electrician" does not include employees of an electrical contractor who perform or supervise work. The Corporate Authorities, by virtue of the Illinois Compiled Statutes, requires candidates for electrical registration to successfully complete a written examination administered by the Village Electrical Commission. (b) Home Owners: The requirement for a registered electrician may be waived with special permission from the Director of Building and Zoning or Electrical Inspector. (c) Where a registered electrician or electrical contractor is found doing electrical work without a permit on two (2) separate occasions within any twelve (12) month period, a hearing shall be held by the Electrical Commission, in the presence of the Electrical Inspector, at which time the permit privileges of said electrician or electrical contractor may be suspended for a period of time not to exceed one (1) year. (d) In cases of emergency, the Electrical Inspector has the authority to disconnect current to any electrical equipment found to be unsafe. 5. Electrical Permit Fees: (a) The fees for fifteen - ampere and twenty - ampere two -wire and three -wire circuits, including fixtures, sockets or receptacles, are as follows: Circuits 15 AMP 20 AMP 3 r r 1 $10.00 $15.00 2 15.00 20.00 3 20.00 30.00 4 30.00 40.00 5 35.00 45.00 6 40.00 55.00 7 45.00 60.00 8 50.00 70.00 9 55.00 75.00 10 60.00 85.00. 11 65.00 90.00 12 70.00 95.00 13 75.00 105.00 14 80.00 110.00 15 85.00 115.00 16 90.00 125.00 17 95.00 130.00 18 100.00 135.00 19 105.00 145.00 20 110.00 150.00 21 115.00 155.00 22 120.00 160.00 23 125.00 165.00 24 130.00 170.00 25 135.00 175.00 Each $4.00 $5.00 additional additional additional circuit over 25 over 25 circuits circuits (b) For thirty (30) amp circuit - double the amount of 15 amp circuit For forty (40) amp circuit - double the amount of 20 amp circuit For fifty (50) amp circuit - triple the amount of 15 amp circuit For sixty (60) amp circuit - triple the amount of 20 amp circuit (c) For services, including service revisions, the fee shall be: 100 amp $35.00 101 through 200 amp 45.00 201 through 400 amp 65.00 4 401 through 800 amp 100.00 801 through 1199 amp 130.00 1200 through 4000 180.00 4001 through 800 amp 240.00 (d) For feeder circuits, the fees shall be: 60 through 100 amp $20.00 101 through 200 amp 35.00 201 through 400 amp 50.00 401 through 600 amp 70.00 601 through 1000 amp 95.00 1001 through 2000 amp 115.00 (e) Motors: The fee for a motor 3/4 horsepower or over shall be $15.00 for the first and $10.00 for each additional, plus the circuit fee. Except for residential units, the fee for a motor less than 3/4 horsepower shall be $5.00 each, plus the circuit fee. (f) Additional systems fees are as follows: System Fee Audio communications Burglar alarm Electronic computer /data processing Fire alarm system Intercom &public address system Relocatable wired partitions Temporary wiring $35.00 35.00 35.00 60.00 35.00 per system 35.00 35.00 (g) In all installations, except signs, the minimum fee shall be $35.00. (h) Electrical permit fees for sign installations shall be based on circuit count in subsection (a) above. (i) Minimum plan review fee shall be $35.00 or twenty -five percent (25 %) of the building plan review fee - whichever is greater. 6. Mechanical Contractor License -- Required: Any person engaging in the business of heating, air conditioning or refrigeration contracting shall be licensed by the Village. Upon the filing of such application for license with the building official and the receipt of a surety bond payable to the Village in the sum of ten thousand dollars ($10,000), which must remain in full force and effect while any heating, air conditioning and refrigeration work is being performed, and the 5 payment of the license fee of fifty dollars ($50), the building official shall issue a license for the calendar year in which it is issued. 7. Mechanical Permit Fees: Heating: Residential - New or replacement unit $40.00 All other uses (new installations) per 2,000 sq. ft. or fraction thereof 40.00 Air Conditioning: (Window units not included) Residential - New or replacement unit $35.00 All other uses (new installations) per 2,000 sq. ft. or fraction thereof 35.00 Minimum mechanical fee 35.00 Plan review fee $35.00 or 25% of building plan review fee - whichever is greater 8. Elevator Permit Fees: New installation: $125.00 Each elevator, dumbwaiter, Moving walk, escalator, conveyor or manlift (includes initial inspection) Semi - Annual Inspections/ 75.00 per inspection Certificate of Compliance Each elevator, dumbwaiter, Moving walk, escalator, conveyor or manlift Repairs and reinspections 75.00 per inspection Plan review fee: Each elevator, conveyor, dumbwaiter, moving walk, Col X IV escalator or manlift for buildings of four (4) stories or less 175.00 Additional fee per floor for every story above four (4) stories 10.00 9. Fire Protection System Fees: Automatic sprinkler system: Each system, 1 -- 100 sprinklers $100.00 Every 100 additional heads or fraction thereof 25.00 Automatic sprinkler system (dry system): Each system, 1 -- 100 sprinklers $125.00 Every 100 additional heads or fraction thereof 25.00 Automatic sprinkler system (pre action): Each system, 1 -- 100 sprinklers $125.00 Every 100 additional heads or fraction thereof 25.00 Partial system on the domestic water system 50.00 Standpipes: Each standpipe system 30.00 Fire pumps: Each pump, regardless of size 50.00 Fire alarm system: Manual or automatic system 60.00 Hood suppression systems: Each system regardless of size 30.00 Clean agent extinguishing systems: Each system regardless of size 50.00 Alternate fire extinguishing systems: Each system regardless of size 50.00 Means of egress access control systems: Each system regardless of size 50.00 7 Plan review fee for all systems: 50.00 10. Swimming Pool Fees: Above - ground pools - Initial installation, enlargement, or alteration $35.00 In- ground pools shall comply with building fee schedule. The installation permit fee shall be in addition to any electrical or plumbing fees that may be required. 11. Health Department Plan Review Fees: Plan review fees for the Health Department shall be $35.00 or 25% of building plan review fee -- whichever is greater. 12. Reinspection Fees: The aforementioned permit fees include one (1) reinspection. Any inspection or reinspection not covered by the fees designated in this section shall be charged at $50.00 per inspection per hour or any part of an hour. 13. Work Prior to Permit: Where work has been started prior to the issuance of a permit, the normal permit fee shall be doubled with a minimum of $35.00 and a maximum of $1,000.00. 14. Certificate of Occupancy The fee for Certificate of Occupancy, including Business License inspections, shall be as follows: Residential (per unit) $50.00 Non - Residential (per unit) 100.00 SECTION 2: Any person violating the provisions of this Ordinance shall be punished according to the provisions of Chapter 1.08 General Penalty. SECTION 3: This Ordinance shall be in full force and effect from and after its passage, approval and publication. This Ordinance may be published in pamphlet form. ! • AYES: 6 - Braiman, Glover, Berman, Johnson, Kahn, Trilling NAYES: 0 — None ABSENT: 0 — None PASSED: August 30 , 2004 APPROVED: August 30 , 2004 PUBLISHED: August 31 , 2004 APPROVED: Village President ATTEST: d a Village Clerk E